REY Technologies Start a project

HomeSolarGround mount

Ground-mount solar, laid out inside AutoCAD.

Utility-scale plants from the satellite map to the bill of quantities: terrain, arrays, strings, cables, trenches and the drawing set. It's where we've built the most.

Site_Boundary.dwg
Command:
E 254,512.40 N 2,048,233.10 MODELGRIDOSNAP E-PV-AREA
Highlights

Every step of a plant layout, in one drawing.

A few highlights from the tools we build for solar teams. Every picture shows a real result from AutoCAD, except the good-for-construction (GFC) concept.

Layout

Array creation

From the site boundary to a full array. Set the fence, setbacks and periphery road, place the lightning arresters, then fill every PV area with frames. A live preview shows the result before a single frame is placed.

  • Fence, setbacks and a rounded periphery road from the site boundary
  • Internal roads from centrelines you sketch, with set-out points
  • Lightning arresters placed first, so frames stay out of their shadows
  • Fixed-tilt and tracker frames, up to four sizes mixed
4 more
  • Standard or adaptive placement, filled to the boundary
  • Maintenance corridors, with a road down the middle if you need one
  • Road coordinates and street lights, each with their coordinates
  • A project summary of frames, modules and capacity
The site boundary in AutoCAD with its fence, periphery road, internal road and setbacks around two ponds, before anything is placed
1Fence, setbacks and periphery road, drawn from the site boundary
The same site with lightning arresters added, each with its shadow area and coverage circle
2Lightning arresters placed first, with their coverage circles
The same site filled with fixed-tilt frames, full frames in blue and half frames in yellow, around the ponds and arrester shadows
3Frames fill the PV areas, clear of setbacks, roads and shadows
Project summary table for the same site: two PV areas, 427 frames, 20,300 modules and 12.38 MW in total
4The project summary: frames, modules and capacity for each PV area
Operations

Cleaning robot analysis

Works out how module-cleaning robots travel along the rows. Frames in a row join into one robot run where the gaps are small enough to bridge. Longer runs get their own automatic robot, and short runs share a semi-automatic one moved between rows.

  • Automatic robots counted for each length range
  • Semi-automatic robots grouped for short runs
  • Each run coloured by its length
  • A row-length label on every run
4 more
  • Bridges across the row gaps
  • Docking and reversing stations at the run ends
  • A whole site analysed in one run
  • A BOQ table of robots, bridges and stations
A site with its automatic robot runs picked out in purple, and a close-up of two rows with numbered docking stations and row-length labels
1Longer runs get their own automatic robot, parked at a numbered docking station
The same site with its semi-automatic runs picked out in magenta inside black group outlines, and a close-up of one group
2Short runs share one semi-automatic robot, carried around inside its group outline
Cleaning robot table: 13 semi-automatic and 48 automatic robots, 299 bridges, 61 docking stations and 195 reversing stations
3Robots by length range, with bridges, docking and reversing stations
Earthing

Earthing layout

Lays out the DC earthing of a fixed-tilt PV area: tables bonded pile to pile, and rows linked by strips in the column gaps.

  • Two side and one side risers, with row links and collectors
  • DC earth pits at about one per MWp
  • Combiner boxes strapped to the grid along the trenches
  • Two earth pits for every lightning arrester
4 more
  • Strips stay inside the PV area and never cross a table
  • A whole site laid out in one run, with the pit numbers carrying on
  • Earth pit coordinates, listed and exported to Excel
  • A detailed earthing BOQ, as an AutoCAD table or in Excel
Earthing strips in green running pile to pile along the rows, with an earth pit beside a string combiner box
1Risers, row links and the combiner box strip, with a pit looped onto the grid
The earthing of a whole PV area drawn over its rows, with collectors running between them
2Every table bonded, with row links, collectors and DC earth pits
The Earth Pit Coordinates panel listing each pit with its easting and northing, beside the selected pit in the drawing
3Every earth pit listed with its coordinates; double-click a row to find it in the drawing
Array earthing BOQ table: six strip types in metres, 26 DC earth pits and 22 lightning arrester earth pits
4Strip lengths by type, and the number of earth pits
Electrical

Electrical grouping

Places the ITCs and groups their inverters, then groups the strings into combiner boxes, by hand or automatically.

  • ITCs placed on the site, with shorter frames filling the room left
  • Automatic combiner box grouping, with options to compare
  • An outline and a station block for each group
  • A tag on every string, such as ITC1-INV2-CB3-S4
4 more
  • A report of strings, DC and AC power and DC/AC ratio
  • The report as an AutoCAD table or Excel file
  • A single-line diagram drawn from the report
  • Tag prefixes and combiner box IDs you can set
Arrays coloured by combiner box group, every table tagged with its inverter, combiner box and string
1Strings grouped into combiner boxes, each group in its own colour
Rows of tables with a tag on every string, such as ITC1-INV1-CB7, and combiner box blocks between the rows
2A combiner box block for each group, and a tag on every string
Electrical grouping report table: four inverters, 1031 strings, 17,753.82 kW DC and 17,398.74 kW AC
3The report: strings, DC and AC power and DC/AC ratio for each inverter
Electrical

Cable generation

String cables run from every string to its combiner box, and DC cables from every combiner box to its own inverter, round the frames and along your guidelines. Cables of two inverters never share a trench.

  • Red (+) and blue (−) string cables in lanes
  • Daisy chain or leapfrog stringing
  • Conduits across narrow table gaps and into the combiner box
  • Several inverter routings compared, the best one drawn
4 more
  • Guidelines where cables must cross open ground
  • A whole site cabled in one run
  • A string cable schedule with ferrule tags, in Excel
  • An inverter cable schedule with voltage drop and power loss
String cables drawn along the rows and gathered into a route to combiner box ITC1-INV1-CB7
1String cables along the purlins, and in one bundle to the combiner box
Coloured combiner box groups with the DC cable routes running through them to each combiner box
2DC cables from every combiner box to its own inverter
DC string cable schedule in Excel: 4 inverters, 63 combiner boxes, 1031 strings and 2062 cable runs, with a ferrule tag on each
3The cable schedule in Excel, with a ferrule tag for every run
Civil

Trench generation

Draws the DC cable trenches along the cables. Each stretch of inverter trench is sized by how many cables share it, from your own section table.

  • Sections A, B, C… as hatched bands with centrelines
  • Each section's width set by the cables inside it
  • String cables share the inverter trench, or get their own
  • Two-layer sections for the heaviest runs
4 more
  • Hume pipes where a trench crosses a road
  • Numbered coordinate blocks along the trench
  • Easting and northing for every block, as tables or Excel
  • Trench lengths in a BOQ
Cable trenches between the rows, labelled by section, turning into an inverter station
1Trenches follow the cables to each inverter, changing section as cables join
A Section B trench passing under a road through a hume pipe, labelled with its size
2A hume pipe block where a trench crosses a road
The Trench Coordinates panel listing blocks DC-01 onward with section, easting and northing, beside blocks placed along the trench
3Numbered coordinate blocks along the trench, with easting and northing
Cable trench sections table: sections Z and A to J with their cables, width and length, 3899.1 m in total
4Each section's cables, width and length, with the total trench length
Civil

Grading

Grades a PV area, or a whole site with all its PV areas and roads, in one run. It finds the finished ground with the least earthwork within your limits, then sets every frame on it within its own structure limits.

  • A colour-coded cut and fill map
  • Cut, fill and net volumes, by zone and by depth
  • Each pile's reveal, embedment and extension
  • A pile schedule with a reveal check, in Excel
4 more
  • Roads graded in the same run, within a maximum grade
  • Crossfall, shoulders and batters, with road junctions matched
  • Profiles with existing and finished ground, frames and piles
  • Small pads, such as ITC areas, graded as platforms
A grading map of a site in red and blue, showing where ground is cut and filled under the frames
1Cut in red and fill in blue, with every frame set on the finished ground
Pile schedule in Excel with its key figures on top: 740 trackers and 7,494 piles, then one row per pile with its coordinates and ground levels
2A pile schedule with ground levels, pile by pile, in Excel
A section across a graded road 4 m wide, showing the carriageway, shoulders and batters, above its profile along the road
3Roads graded in the same run, with carriageway, shoulders and batters
A profile through a graded site, with the whole section above and three frames close up below: the existing and finished ground lines, and each pile with its height
4A profile through the site: existing and finished ground, frames and piles with their heights
Analysis

Shadow analysis

Draws the ground an object's shadow covers over a date range and daily hours, for trees, buildings, poles and lightning arresters.

  • A hatched shadow area for each object
  • An optional shading-frequency heatmap
  • Hills on the far horizon can be included
  • Location from the drawing, or by latitude and longitude
Shadow outlines from two lightning arresters falling across the solar arrays
Outputs

SLD and reports

The grouping report draws the single-line diagram, and the project summary gives a bill of frames and capacity for the whole project, plot by plot.

  • One branch per inverter, with its combiner boxes
  • Strings drawn module by module, with their tags
  • Frames, modules, DC capacity and GCR for each PV area
  • Cut and fill totals from grading
2 more
  • Combiner box and arrester coordinates for setting out
  • Tables in the drawing, and Excel files
The whole single-line diagram on a dark drawing screen: four inverter branches, each with its combiner boxes and string groups
1The whole plant: one branch per inverter, with its combiner boxes and strings
Close-up of one inverter on a dark drawing screen: four combiner boxes feeding its bus, each beside a dashed box of 16 strings
2Each combiner box with its string count, and its strings drawn module by module
Project summary table for three plots: 650 frames, 31,696 modules and 19.50 MW in total
3A bill of frames and capacity for the whole project, plot by plot
Google Earth

Import and export KML

Brings a Google Earth KML or KMZ file into the drawing at its real position, and sends the finished layout back out, to share with anyone who has Google Earth.

  • Points, lines and polygons drawn at their real position
  • Each placemark on its own layer, in its Google Earth colours
  • A WGS84 UTM location set if the drawing has none
  • Export to KML or KMZ, in latitude and longitude
2 more
  • One folder per layer, with the objects' colours
  • Solid hatches exported as filled polygons
A site boundary imported from a KML file and drawn as an outline in AutoCAD
1A KML site boundary, drawn at its real position
A solar layout exported to KML and shown in Google Earth over satellite imagery, with frames, roads and arrester shadows in their drawing colours
2The finished layout opened in Google Earth
Outputs

GFC drawings

Good-for-construction drawing sets, generated from the finished layout, the way our rooftop suite builds its GFC sheets.

  • Sheets set up from the same drawing
  • Built on the same layout as every other tool
See the rooftop GFC sheets
A concept of a construction sheet: the site layout beside a legend, a north arrow and a blank title block
Concept only: how a ground-mount construction sheet could look
Time saved

By hand, then with the tools.

An illustrative 10 MW site, task by task. Real hours depend on the site and the team.

By handWith the tools
Illustrative hours for each task, by hand and with the tools
Array layout
16 h
5 h
Cable schedules
24 h
8 h
Earthing layout and BOQ
20 h
7 h
Trenches and coordinates
16 h
6 h
Grading and pile schedule
30 h
12 h
SLD and reports
12 h
4 h
Illustrative 64%

less time across these six tasks, in this 10 MW example

By hand
118 hours
With the tools
42 hours
The toolset

A complete solar plant, designed inside AutoCAD.

The same engineering we put into client tools, as one connected set.

The Array Creation palette showing a fixed-tilt PV area filled with full and half frames, lightning arresters and their coverage circles
Array Creation · live preview before frames are placed
Tools 28

for site, terrain, layout, electrical and civil work

Design time up to70%

less on utility-scale layouts

Drawings 1

where every tool reads what the last one wrote

Client work

Built for solar teams.

We don't name project clients here, and we're happy to share references.

All projects
R01R02R03R04R05R06R07R08GROUP 1GROUP 2AGROUP 2BOBSTRUCTION
  • Solar · ground mount
  • AutoCAD · ARES

Solar arrays and cleaning-robot planning

Frames and arrays drawn from a library, then rows grouped and numbered for cleaning robots, split where an obstruction breaks a row.

  • Frame creation and frame library
  • Array placement on the site
  • Robot groups, subgroups and row numbers
  • One installer for AutoCAD 2021 to 2027
1 more
  • Versions for ARES Commander 2026 and 2027
Platforms

Built on the CAD your team already uses.

  • AutoCAD 2021 to 2027
  • ARES Commander
  • BricsCAD
How our tools are delivered

Installed once, kept current.

  • Release notes, videos and a user guide
  • Automatic updates
  • A signed installer
  • Palettes in light and dark themes
Also in solar

Rooftop solar

Commercial and industrial rooftops, from the roof outline to GFC sheets.

See rooftop solar
FAQ

Questions solar teams often ask.

Anything else, just ask in your enquiry.

Which CAD versions does it run on?

AutoCAD 2021 to 2027. We've also built tools for ARES Commander and BricsCAD, so tell us what your team uses.

Does it handle both fixed-tilt and trackers?

Yes. Array creation places fixed-tilt and tracker frames, with up to four frame sizes mixed, and grading sets each frame within its own limits. The earthing layout is built for fixed-tilt areas.

Can we start from a Google Earth file?

Yes. Import a KML or KMZ file and its points, lines and polygons are drawn at their real position, on layers named after the placemarks. If the drawing has no location yet, it gets one from the file.

Can it work with our own frames and standards?

Yes. You set the frame sizes, pitch, row spacing and corridors, and the trench sections come from your own table. If you need something it doesn't do yet, that's the work we do: we build CAD tools around a team's standards.

What happens when the layout changes?

Run the tool again. Its earlier result in that PV area is replaced, not added to. Each later tool reads what the one before it drew, so you run them again in turn.

Can it handle a site with several PV areas?

Yes. Pick the site boundary instead of one PV area, and tools such as cleaning robots, cables, trenches and earthing cover every PV area of the plot in one run.

What do we get at the end?

A drawing with every layer in place, plus tables and Excel files: cleaning robot and earthing BOQs, cable schedules, a pile schedule, trench and earth pit coordinates, the project summary and a single-line diagram. The layout can also go out as KML for Google Earth.

Can we see it working on our own site?

Yes. Send us a site boundary or a sample drawing and ask for a demo. We're happy to sign an NDA first.

Have a plant to lay out?

Send us the site boundary and your design rules. We'll reply with an approach and a fixed quote.

Call +91 98217 09809WhatsApp usFixed quotes per milestone
Chat with us